Today’s update highlights the continued advancement to accomplish the dignified goal of sustainably for the JRDCs school. This means the project has advanced with significant strides in setting in place infrastructures that are poised to generate income to maintain its impact and operation over the long term, even after initial funding or external support from donors.
The Security concrete wall with 8 Shops for sustainability is now 80% complete. As we noted Phases 1and 2 has already been successfully completed. This included the back side wall of the 8 shops; a 36 meter wall and with a main gate and columns.
Phase Three we report, with thanksgiving, is now being completed.
This phase included the rendering or plastering work, electrical instillations for 8 shops, the putting in of ceilings, doors and metal shutters.
There is also a new Guard house being constructed adding to the facility and security of the students, Staff.
We thank you for your support and look forward to you to continued prayers and support this noble project built and maintained by you, through the Grace of our Most High God.